Pilot the Project

Pilot when the actual implementation must "work right" out of the gate.
  • Some projects require piloting individual deliverables and or as well as piloting the project

  • Determine if a pilot will be required prior to full implementation, if not then skip the following items.

  • Develop a detailed pilot plan including:

  • What will be piloted

  • Who will participate in the pilot and are they available

  • Length of the pilot

  • Budget, tools, or materials required for the pilot

  • What will be measured

  • Who will assess the results

  • Who will determine success or failure

  • What will happen if the pilot is successful

  • What will happen if the pilot is not successful